How do you order made-to-measure tile-effect metal roofing without a costly mistake?
Made-to-measure tile-effect metal roofing requires an accurate description of the roof slopes. The roof area alone is not enough. You need lengths, laying directions and decisions on details at the eaves and ridge. It is also worth establishing who is responsible for the final cutting plan. One short conversation before production is often cheaper than later reworking an entire batch of sheets. The measurement should cover the actual dimensions of the slopes, their diagonals and the position of the edges. The planned eaves and the termination at the ridge must be taken into account. The length of the structural element does not have to correspond to the length of the ordered sheet. Chimneys, windows and any changes in plane are also important.









