About PiVi

This author has not yet filled in any details.
So far PiVi has created 1404 blog entries.

Inspecting above-rafter PIR before the roof covering goes on

Once a pitched roof is covered, it is difficult to inspect the PIR board joints or the junctions with adjoining insulation. Agree an inspection point with the roofer before work starts. Have the roof section and the eaves, ridge and roof window details ready, then check them in turn before the next layer conceals them. This checklist helps the client record how the design was built and direct questions to the right person. It does not replace the fixing design or the instructions for the selected system.

By |2026-11-09T11:23:40+01:002026-11-09|Uncategorized|Comments Off on Inspecting above-rafter PIR before the roof covering goes on

Buying surplus trapezoidal sheets: inspecting a batch before ordering

When buying a surplus batch of trapezoidal sheet, first work out how many of the available sheets actually fit the building. List lengths, cover widths, profiles and coated faces. Separate sheets with bent edges from those that merely differ in shade. Bent edges may prevent a tight side lap, whereas a shade difference may matter mainly on a prominent elevation. Assess each sheet against its proposed position. A schedule of usable pieces gives a better basis for pricing the batch than its total area. For structural decking, you also need documentation identifying the exact profile and material.

By |2026-11-09T10:53:09+01:002026-11-09|Uncategorized|Comments Off on Buying surplus trapezoidal sheets: inspecting a batch before ordering

Pausing façade insulation work and handing over the unfinished wall for winter

When façade works stop before winter, each elevation may be at a different stage. Boards beside the entrance may still be exposed while the garden wall already has a reinforced base coat. For each wall, record the last layer installed, locations open at the top and the protection agreed for that system. The contractor can use this record to prepare the building for the break and decide where to resume in spring. A marked-up elevation makes it easy to find the areas that need another inspection.

By |2026-11-09T11:54:14+01:002026-11-09|Uncategorized|Comments Off on Pausing façade insulation work and handing over the unfinished wall for winter

A heated work bay in an unheated hall: where should the panel enclosure run?

In an unheated hall, enclosing an inspection bay can be an alternative to heating the entire building. First trace the boundary of the heated space: its walls, the space overhead, the floor and the doorway. That gives a supplier a meaningful basis for pricing the sandwich panels. A room opened a few times per shift is a different proposition from a bay with constant forklift traffic. A single annotated drawing can bring the thermal boundary, access routes and space for servicing equipment into the same discussion.

By |2026-11-09T12:28:31+01:002026-11-09|Uncategorized|Comments Off on A heated work bay in an unheated hall: where should the panel enclosure run?

Cleaning a livestock building ceiling. What should you ask before buying panels?

Two ceiling panels can have the same thickness and a white underside yet require different care. When asking for a quotation, describe how the farm plans to wash the ceiling, what it currently uses to clean the room and how service penetrations are finished. Ask for an answer specific to the proposed facing and the joints in the completed ceiling. That makes quotes easier to compare and helps identify a purchase that would also require a change to the farm’s routine. Here is what to collect before ordering and what to hand over to the people responsible for the first clean.

By |2026-11-09T14:06:41+01:002026-11-09|Uncategorized|Comments Off on Cleaning a livestock building ceiling. What should you ask before buying panels?

Why does a PIR board’s resistance table give a slightly different conductivity from its label?

A PIR board data sheet lists thickness, thermal resistance and declared conductivity. Divide thickness by resistance and the result may differ slightly from the label. That alone does not show an error or a loss of performance. The table reports numbers to a stated precision; reversing the calculation cannot recover digits that were never printed. Using one product as an example, we show how to check the units, select the right row and interpret the difference. We also explain why the number you obtain should not become a new design conductivity in your specification.

By |2026-11-09T15:15:21+01:002026-11-09|Uncategorized|Comments Off on Why does a PIR board’s resistance table give a slightly different conductivity from its label?

Lighting and speakers beneath a grandstand roof: preparing an equipment plan

A grandstand roof may carry lights, speakers, cameras and cable routes. Before an installer proposes fixing them to profiled sheeting or the supporting frame, prepare a shared equipment plan. Connect each device location to its specification, cable route and future servicing arrangements. The speaker weight alone does not describe the complete installation: brackets and other suspension components also need to be identified. This guide explains how to assemble information for the venue operator, designers and contractors. It also separates suggested positions from approved fixing locations and sets out a practical handover record. The support and connection must be selected through a design that accounts for the actual roof.

By |2026-11-09T15:47:31+01:002026-11-09|Uncategorized|Comments Off on Lighting and speakers beneath a grandstand roof: preparing an equipment plan

Insulation under load: reading the data for floor insulation boards

Selecting insulation beneath a loaded floor takes more than comparing conductivity and thickness. For PIR, EPS, XPS and mineral wool boards intended for such applications, check the properties of the exact product and the complete load-bearing assembly. A compression figure does not by itself specify how much equipment a room can carry. Test conditions, load duration, load distribution and the layers above the insulation all matter. This guide explains what to collect before speaking to the designer and how to avoid misleading comparisons between technical sheets. It is not a load calculator and cannot determine an allowable rack, machine or vehicle weight from a single board property.

By |2026-11-09T16:43:55+01:002026-11-09|Uncategorized|Comments Off on Insulation under load: reading the data for floor insulation boards

Insulating a home in stages: count the cost of stopping and restarting work

Insulating a home in stages spreads expenditure over time, but is not automatically cheaper than a single order. A comparison also needs the costs of renewed façade access, deliveries, protection of unfinished areas and restarting work. Some items may occur once; others can return at each stage. This guide helps organise a programme, identify unfinished junctions needing a technical solution, and distinguish a smaller first payment from a lower total project cost. It covers the records needed before a pause and when the contractor returns. It does not recommend leaving insulation exposed or dividing work at arbitrary points. Stage boundaries should follow the design, the selected construction system and the conditions of the particular building.

By |2026-11-09T17:31:06+01:002026-11-09|Uncategorized|Comments Off on Insulating a home in stages: count the cost of stopping and restarting work

Sandwich panel delivery: when is the site ready for the truck?

A sandwich panel delivery date should reflect site readiness, not just material availability. Before dispatch, agree access, the unloading area, responsibility for equipment and storage until installation. Each point requires information about the actual order and current conditions at the site. This guide helps prepare an organisational readiness check covering people, tasks, dependencies and a contingency for delayed work. It does not replace unloading instructions or a safety assessment. Equipment selection and handling arrangements for the particular packs must be established from the manufacturer's documentation and site conditions before the arrival of a truck forces improvised decisions.

By |2026-11-09T18:43:31+01:002026-11-09|Uncategorized|Comments Off on Sandwich panel delivery: when is the site ready for the truck?
Back to top