Mansard roofs: where they add space and what makes them complex

A mansard roof is distinguished by slopes broken into two sections of differing pitch. The lower, steeper part increases the usable attic area, while the whole demands a sturdier structure and more numerous details. With metal roofing tiles, both parts of the slope, the break line, ventilation and drainage must be planned separately. Such an arrangement may top a gable roof or a more complex one, and its appearance depends on proportions, eaves and windows. There is no single universal pitch angle.

2026-11-15T00:23:35+01:00

How much does an Oborniki sandwich panel cost and what lies behind the name?

The name “Oborniki panel” is a colloquial term for a sandwich panel. It does not describe a single core or a single quality. In this group you will find wall and roof elements with different parameters. The price therefore depends on the specific set of features. Before purchase, it is necessary to establish what the partition is to do and which items the offer includes. The panel consists of a core bonded to facings. Popular core groups are PIR, PUR, mineral wool and EPS. The materials differ in thermal conductivity, behaviour in fire and mass. The word “Oborniki” alone does not allow any of these properties to be assessed.

2026-11-14T13:13:51+01:00

PIR or EPS for the roof of a pavilion used all year round?

In an all-year-round pavilion, the roof should suit the heating, moisture and everyday operation of the interior. Choosing PIR or EPS therefore requires comparing whole panels. The same thickness does not mean the same thermal effect. It is also worth checking the coatings and joints, because the type of core does not solve every problem. Establish the operating temperature and heating periods. A facility opened for a few hours functions differently from a room maintained at a constant temperature. Doors, ventilation and the presence of heat-emitting equipment also matter. The roof is part of this system.

2026-11-14T13:15:27+01:00

Replacing an asbestos-cement roof with modern fibre cement sheets: planning the work

Replacing an old roof begins with identifying what is already on the building. A similar sheet shape does not tell you whether the sheets contain asbestos or whether the structure is suitable for further use. New corrugated fibre cement sheets are a separate material choice. Asbestos-free fibre cement can preserve the corrugated character of the roof slope, but it does not remove the need to plan the dismantling, the protection of the building and the correct installation of the new system. First, gather the available documents, the renovation history and clear markings. The composition should not be identified solely by colour or by the age of the building. An old roof may contain elements from different periods. If asbestos is suspected, corners should not be broken off, drilled or samples taken independently.

2026-11-15T19:36:14+01:00

Why can two similar panels have a different price per square metre?

Two light-coloured panels of the same thickness can differ in construction and scope of application. The price per metre conceals more than the colour of the facing. Before choosing, it is worth comparing the parameters and the quantity of material to purchase. This makes it clear whether the surcharge corresponds to the needs of the building and whether a lower rate offers real savings. Start with the type of core and the thickness of the sheets on both sides. Check the profiling and the method of fixing. A similar surface area does not confirm the same weight or load-bearing capacity. Parameters should be stated for the specific variant covered by the offer.

2026-11-14T13:15:32+01:00

The role of metal roof coverings in contemporary architecture

Begin by defining what the surface must do, not by choosing a colour. Metal roof tiles, T18, T35 and sandwich panels differ in seam construction, load capacity and permitted application, so not every one suits every situation. Appearance depends on proportions, a repeated rhythm and careful details, while the choice should follow interior function, structure and thermal requirements. Set a palette for the whole building form and limit random divisions. Coordinate the sheet layout with the positions of windows, gutters and façade edges at the design stage.

2026-11-14T20:35:54+01:00

Replacement coverings for an asbestos-cement roof

Replacing an asbestos roof really means two jobs: getting rid of the asbestos safely, then picking a covering that suits the roof's condition. Lightweight metal tile or trapezoidal sheet can be a sensible choice, and in a heated building it is worth considering better insulation too. Base the decision on an inspection of the structure, the pitch and how the roof is used. Breaking, cutting or drilling old sheets releases harmful fibres, so have the removal done by a contractor equipped for this work and for handling the waste. Don't leave broken sheets lying loose on the plot. Beforehand, check the formal requirements and any help your municipality offers.

2026-11-14T20:36:27+01:00

Anchoring a timber wall plate to a concrete ring beam

Anchoring the wall plate must resist weight, wind uplift and horizontal forces from the roof structure – it is not merely a fixing aid during assembly. The designer specifies the anchor type, spacing and embedment depth, since no single arrangement suits every roof. Before covering, verify compliance with the documentation, the condition of concrete and timber, and that washers and nuts are complete. Remember that even robust anchoring fails where timber is crushed or the concrete edge offers insufficient bearing.

2026-11-15T00:22:33+01:00

IKO enertherm ALU TG: joints, gaps and airtightness of the building element

With IKO enertherm ALU TG, a gap first requires establishing whether it has arisen at the factory tongue-and-groove joint or at a cut piece without a tongue. These are two different mechanisms: damage to the profile during processing, or the result of a cut which by definition changes the edge. The inspection should cover the width of the last strip, the position of the profiled-edge ends and the conditions under which the symptom appeared. A row plan with the cut edges marked provides a reference for the assessment. Only against this background can a joint defect be distinguished from a characteristic of the cut piece and the scope of the repair be specified.

2026-11-16T03:25:48+01:00

Roof insulation: planning the right sequence of work

Insulating a roof requires first establishing which rooms will be heated, not merely choosing an insulation thickness. It is worth checking whether the insulation forms a continuous shield for those rooms and whether its route follows the design. The sequence of work matters because later correcting a covered junction may require dismantling the construction. The drawing should mark the roof connections to walls, wall plates, windows and ceilings, and assess the space for services. The solution should be developed before ordering material.

2026-11-14T20:37:06+01:00
Back to top