Building academy2026-11-15T19:17:48+01:00

Choose a product group

Metal roofing

Blachy trapezowe — ilustracja kategorii

Sandwich panels

Płyty warstwowe — ilustracja kategorii

PIR insulation boards

Płyta izolacyjna PIR z cienką folią — ilustracja kategorii

XPS

Płyty XPS — ilustracja kategorii

Accessories

Wkręty i łączniki — ilustracja kategorii

Fencing

Sztachety metalowe — ilustracja kategorii

Building academy

The Izoprofil.org building academy explains decisions made during construction and refurbishment. The articles start with the materials themselves, including sandwich panels, PIR insulation boards and profiled sheet metal. Learn the terms used in product descriptions and how several properties affect a complete assembly. Topics include thermal insulation, joints, moisture protection, roof coverings and purchasing. Each article includes a summary and contents to help you find the relevant detail. Use the guides alongside the drawings and product documentation for your own project.

Building a large cold room with sandwich panels: from chamber design to an airtight enclosure

A cold room is a large insulated chamber, but its performance depends on the details. The walls, ceiling, floor and doors must limit heat and moisture ingress. PIR sandwich panels make it easier to build the envelope; they do not replace refrigeration equipment or a properly designed floor. In a freezer room, sealed joints and protection for components exposed to sustained low temperatures are particularly important. Chilled and frozen storage do not call for identical enclosures: operating temperatures differ, as do the consequences of moisture ingress. Before selecting panel thickness, tell the designer what goods will be stored, their temperature on arrival and how often the doors will open.

Are sandwich panels suitable for an indoor ice rink?

Sandwich panels can form the walls and, in some designs, the roof of an indoor ice rink. They limit heat transfer and make it possible to enclose a large structure quickly. An ice rink poses different challenges from a warehouse: humidity, the risk of condensation and spectator comfort all matter. The envelope therefore needs to be designed together with the structure, refrigeration, ventilation and fire protection. The primary structure must span the rink and keep the space above the ice clear. Sandwich panels enclose the building and transfer loads to their supports; they do not replace the main girders. Coordinating the panel layout with the frame and façade divisions allows large panels to be installed without unplanned cutting on site.

How do you finish a loft and choose materials for sloping ceilings?

A loft fit-out starts well before the first plasterboard goes up. Inspect the roof, plan the insulation and establish how the layers will be made airtight. Framing, lining and jointing follow. PIR boards can reduce the insulation thickness needed, but form only part of the lining system. The materials must work together around windows, walls and services. Check the roof covering, flashings, window junctions and timbers before concealing them. Repair leaks and timber damage first. When converting a loft, establish the load capacity of the floor and the applicable approval requirements. Partitions, flooring and furnishings add loads. Adequate headroom alone does not make a loft suitable for habitation.

How is a roof built, from the first measurements to handover?

Roof construction starts with accurate measurements and a design that specifies the geometry, supports, loads and sequence of layers. Each stage prepares the surface for the next. A neatly fitted flashing cannot correct a defect concealed beneath the covering. The order of work depends on the insulation and roof covering, which also influence the pitch, support spacing and edge details. Coordinate chimneys, access hatches and penetrations before ordering. Plan safe access for the crew, lifting of materials and weather protection while the building is open. The material schedule should include sheets or panels, flashings, fasteners, seals and rainwater goods.

What makes a home energy efficient and how do you assess its environmental impact?

A home can use little energy in operation and still have significant environmental impacts from its materials, maintenance or replacement work. Reducing heat loss and choosing durable, repairable components helps address both questions. PIR can provide high thermal resistance in a thin layer when the design also accounts for moisture, ventilation and summer comfort. The energy used while a building is occupied depends on its envelope, its services and how people use it. A wider environmental assessment also includes manufacturing, transport, construction, refurbishment and what happens at the end of service life. Consider both perspectives when comparing designs.

Planning an energy retrofit, from identifying heat loss to final inspection

An energy retrofit works best when the roof, wall and floor insulation is planned together with windows, heating and ventilation. PIR can help where the insulation needs to be thin. Damp substrates and faulty junctions need attention before new layers go in. The sequence of decisions matters as much as the choice of insulation. Start with the energy bills, patterns of use and the condition of the building envelope. Determine whether the problem is high heat loss, air leakage, incorrect controls or moisture. Thermal imaging can help, provided the survey conditions are suitable and the images are interpreted in context.

Back to top