PIR insulation
SOPREMA PIR boards: distinguishing insulation defects from leaks
At a glance
Moisture at the skylight above the BLUE A layer requires establishing whether the insulation is failing or whether water is penetrating through the detail. Visible dampness does not yet indicate the point of ingress, so the tightness of the covering, the continuity of the vapour control layer and the drying conditions of the assembly must be assessed. Replacing the board alone without identifying the path of the moisture will leave the cause within the same detail. For EFYOS BLUE A, what is crucial is the inspection of the junction between the vapour control layer and the skylight upstand, as well as the arrangement of all layers at the base of the skylight, together with the conditions under which the symptom arose.

First, the question of the cause
Compare the detail with a drawing in which each protective layer has its own line. This shows whether thermal continuity, airtightness and rain protection were maintained separately. Without such a comparison, a joint defect is often mistaken for a property of the board.
The right product and the scope of its data
In the analysed cross-section, the thermal layer is EFYOS BLUE A, whose PIR core is enclosed in aluminium facings. The declared λD = 0.022 W/(m·K), the compressive stress level CS(10/Y)120 and the fire reaction E refer to this product, not to the adhesive, covering, vapour control layer or the classification of the finished roof covering — each of these elements has a separate task in the roof design. That is why we consider SOPREMA PIR boards within the boundaries of a complete roof with vapour control layer, thermal insulation and covering. In the order, the full name EFYOS BLUE A replaces the generic “polyurethane boards”, and the properties of the complete board also include the facings, not just the PIR foam core.
How to read a simple example
Where there is a trace of moisture, observation must be separated from hypothesis. A wet surface can be established at a specific location, but not always the source of the ingress straight away. In the case of EFYOS BLUE A, the adjacent joints and protective layers must be checked. The result of the inspection should also identify places that are not accessible. Only a confirmed path of moisture justifies the scope of the repair, instead of automatically replacing every board located beneath the symptom.
In EFYOS BLUE A, access to the seal after the subsequent layers have been laid determines whether it can be improved. The board’s aluminium facing with a lambda of 0.022 W/(m·K) does not explain every defect. Trace each layer from the roof field to the termination at the vertical upstand before drawing a conclusion. The reference is photographs of continuous joints taken before covering; in the event of a discrepancy, first correct the description of EFYOS BLUE A and the condition of the layers.
Matching the action to the identified problem
If the connection between the vapour control layer and the skylight upstand is missing, thickening the BLUE A in the middle of the roof slope will not recreate it. The foil on the board is not an independent vapour control layer for the whole roof. The works coordinator should identify the damaged junction and align the repair materials with the cross-section of all layers at the skylight.
What can be seen at the joint
The EFYOS BLUE A inspection should establish whether the joints between the insulation sheets are not substituting for the sealing of the vapour control layer, and assess the condition of the aluminium facing. A different print or shade does not compensate for an open gap, a loss of facing or permanent deformation; the reference is photographs of the continuous joints taken before covering. On the other side there is or will be a covering with skylight flashing, on which access to the damage depends. In the note, record whether the inspection covered the vapour-control connection at the skylight’s vertical upstand, or whether the connection at the skylight remained covered.
How to separate a feature from a defect
Fixing the covering requires a suitably prepared substrate also next to the skylight base. Check which subsequent layers block access to the seal and in what order they can be reinstated. A drawing with separate lines for the protective layers will allow the coordinator to reconcile the repair of the connection with the result of the exploratory opening.
The conclusion should have limits
Photographs taken before the skylight base was covered help to reconstruct the connection between the vapour control layer and the upstand. Compare them with what was actually exposed and indicate the places requiring further access. The list of EFYOS BLUE A repair materials should separately account for thermal continuity, airtightness and protection against precipitation.
7 branches. Materials closer to your project.
- SEROCK — Dzierżenin 34 E
- BŁONIE — ul. Sochaczewska 138A
- RADOM — ul. Grobickiego 8
- ŁÓDŹ — Natolin 8
- OLSZTYN — Barczewo, ul. Prosta 9
- WROCŁAW — ul. Jerzmanowska 10C
- GORZÓW WLKP. — ul. Zielona 33/34