How do you connect foundation insulation to a ground-bearing floor?

At a glance

Connecting the foundation wall to the floor on the ground requires continuity of thermal protection and moisture protection. The EPS boards in the floor and at the wall may have different parameters, because they are subjected to different loads. The perimeter of the floor requires the most attention. That is where a cold strip can easily be left, the sealing can be interrupted or the installation can be routed incorrectly. A large floor area can be insulated correctly, and yet increased heat flow still occurs at the walls. This results from the geometry of the connection and the structural materials. A concrete element that bypasses the insulation creates a thermal path that is not described by merely increasing the EPS thickness in the middle of the room. A section through the perimeter is therefore needed.

EPS boards leaning at the junction of a concrete wall and floor

Why is the middle of the floor not enough?

A floor on the ground does not behave like a wall separating the interior from the air. Its balance also depends on the ground, the dimensions of the building and the perimeter. The formula R = d/λ is useful for comparing insulation, but it does not on its own determine the result for the entire floor. Uc and the effect of the thermal bridge at the junction must be determined using the appropriate calculation method.

Which layers must meet each other?

In a typical house, the floor insulation is located on the inner side of the foundation wall, while the vertical thermal insulation runs along the outside. Their connection does not always mean direct contact between the boards. There may be a structure between them. The design shows how to limit this thermal bridge and where to bring each layer.

The continuity of the waterproofing must be resolved separately. The horizontal waterproofing of the floor should connect with the specified protection of the walls. It is not enough to press the foil against the polystyrene. The overlaps, seals and service penetrations must correspond to the chosen solution. The sequence of works must be planned so that, after the EPS has been laid, access to the required connections remains possible.

Why is the same EPS not always used?

In the floor, the boards carry the loads transmitted by the screed. At the foundation, they are subject to ground pressure and moisture. These tasks lead to different selection criteria. In the floor, deformation is particularly important, while in the ground zone, water absorption and confirmed intended use are also important. A single trade name will not replace a comparison of properties.

CS(10)100 denotes the stress level at 10% deformation. A permissible long-term load must not be derived from this value. For vertical EPS, WL(T) must be checked, among other things, and for the floor system, the requirements of the screed and the imposed loads. The low lambda value of both boards is a thermal advantage, but it is not proof that they are interchangeable.

How should services be routed at the perimeter?

Pipes passing through the wall and floor should have a planned location. Cutting wide channels at random at the last moment can interrupt the thermal insulation or damage the waterproofing. Penetrations through the water barrier require proper sealing. Foam alone in the gap is not automatically a solution for every type of leak.

The layer under the screed should provide even support. If services run in the lower part of the floor, their surroundings must be executed in accordance with the design, without rocking boards and voids. Random pieces of EPS are not stuffed in there. The upper insulation layer should remain continuous, and the perimeter tape should separate the screed from the vertical elements.

What should be considered with external doors?

The threshold connects the interior, the wall and the external zone. It has little space for insulation while also transferring loads. The detail should indicate the correct support, thermal insulation and the method of protection against water. The load-bearing element must not be replaced by any façade board simply because it is easy to cut and has a good lambda value.

The floor level, threshold height and planned terrace must be determined together. A decision made too late for thicker insulation can cause a conflict with the door or the required finished height. Before ordering the boards, it is worth transferring the levels to the construction site and comparing them with the actual condition. This allows avoiding thinning the insulation at a critical point.

What should be inspected before covering?

The perimeter edge, waterproofing joints, pipe penetrations and the support at thresholds must be inspected. The boards should lie stably and their joints should be closely fitted. The perimeter strip must not be replaced with hard mortar. Photo documentation is most valuable when it shows the layers with the location marked before they are covered by the screed or backfill.

Once the floor has been laid, access to the detail is difficult. Any discrepancies with the design should therefore be clarified in advance. It is also worth keeping the labels of both types of EPS. In a later diagnosis of a cold strip along the wall, it will then be possible to check the actual thicknesses and properties. The purchase invoice alone does not always allow the full build-up to be reconstructed.

Floor EPS and the variants for the foundation zone are produced by, among others, Polstyr, Ekobud, Justyr and Austrotherm. Each board is selected for its place of use.

7 branches. Materials closer to your project.

Izoprofil.org map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E
  • BŁONIE — ul. Sochaczewska 138A
  • RADOM — ul. Grobickiego 8
  • ŁÓDŹ — Natolin 8
  • OLSZTYN — Barczewo, ul. Prosta 9
  • WROCŁAW — ul. Jerzmanowska 10C
  • GORZÓW WLKP. — ul. Zielona 33/34

Check prices and availability: +48 500 409 109

Free quote