In brief

In Poland, begin the procedure at the municipal office responsible for the property. Ask whether a call is open and what work the support covers. Funding may pay for dismantling, collection, transport or disposal of waste, but it does not replace payment for a new roof covering. Before signing a contract, confirm the conditions, deadlines and how the contractor is chosen. Also find out how to report asbestos-containing products and what the funded scope includes. Do not order demolition in the hope of later reimbursement.

Close-up of the corrugations and pressings of cut-to-size metal roof tiles.

Where to start checking available support?

The first place to start is the municipal office responsible for the property. Ask about the current call for applications, the required notification of asbestos-containing products and the scope of funded works. Establish who selects the contractor and whether the owner may commission the service independently. In some programmes, collection is organised collectively.

Do not order dismantling on the assumption that the cost will be reimbursed later. The regulations may require an application to be submitted before work begins or a specific contract to be concluded. Also check whether the support covers sheets still installed or only waste previously deposited on the property. These are two different scopes of work.

Does a nationwide programme mean an open call for the owner?

The 2026 programme provided funding for activities including dismantling, collection, transport and disposal of asbestos. The central call was addressed to the regional funds. Under it, the homeowner did not directly submit the same application as the institution distributing the funds.

According to the status checked on 1 November 2026, the indicated central call with a deadline from 27 April to 29 May 2026 had already closed. This does not determine the availability of a local measure. Information on the possibility of participation must be obtained from your municipality or the competent fund. An old notice about the call is not confirmation of available funds.

What can you receive funding for, and what do you pay for separately?

Separate the removal of the hazardous material from the installation of the new roof. Asbestos funding does not automatically mean reimbursement of the roof structure, membrane, insulation, sheet metal, flashings and gutters. Each programme has its own list of eligible costs. The phrase ‘roof replacement’ in a colloquial description may be broader than the scope of support.

Prepare two cost estimates. The first should cover the removal and disposal of asbestos. The second should concern the new covering and repairs revealed after demolition. This makes it clear what portion of the project requires own funds. Do not treat the announced subsidy as ready payment for the roofer.

Izoprofil.org building academy — Metal Sheets from SteelProfil

Who should dismantle old sheets?

Removal of asbestos should be entrusted to a suitably prepared contractor. Proper organisation, safeguards and legal transfer of waste are required. Do not cut the sheets, do not break them and do not clean them with a pressure washer. Such actions can cause the release of fibres. Dropping the covering into a skip yourself is not a safe method of renovation.

Agree with the contractor how the acceptance of waste will be documented. Keep the contract and confirmations needed for settling the programme. The timing of removal of a particular covering also depends on an assessment of its condition. The national target of asbestos removal by 2032 is not a reason to leave a damaged roof without an assessment.

How to choose a new roof covering after asbestos removal?

First check the structure. Old battens and rafters may be damp or damaged. Lightweight trapezoidal steel sheet or tile-effect metal roofing helps to reduce the weight of the new covering, but does not replace repair of the roof truss. The designer should assess the load-bearing capacity and the method of making the connections.

For a simple roof slope, sheets cut to size can be considered. On a roof with numerous folds, smaller modules are often convenient. For an outbuilding or a hall, the selection may also include an insulated roof sandwich panel. In that case, the pitch, support spacing, fire requirements and conditions of use of the interior must be checked.

How to coordinate dismantling with delivery of the new material?

Establish a joint schedule with the dismantling contractor and the roofing crew. The building should not remain accidentally exposed between two independent dates. Plan protection against precipitation and a place for safe storage of the new material. The sheets require protection against damage and prolonged dampening of the pack.

Before ordering, confirm the actual dimensions of the roof slopes. Old sheets are not a good reference for the length of the new steel sheet. Check the flashings, the eaves and water drainage. The budget reserve should account for possible repairs to the substrate, not only a percentage of additional sheets.

What questions should you ask before signing the contract?

Ask about the call deadline, the support limit, the required attachments and the moment when eligible works may begin. Check whether the grant is settled with the owner or with a contractor selected by the municipality. Also establish who documents the quantity of waste and what the final confirmation of its transfer looks like.

In parallel, clarify the building formalities concerning the new roof. Participation in the asbestos removal programme alone does not replace the required notification or permit. Complete information allows the covering to be ordered at the right time and avoids a gap between dismantling and protecting the house.

7 branches. Materials closer to your project.

Izoprofil.org map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E
  • BŁONIE — ul. Sochaczewska 138A
  • RADOM — ul. Grobickiego 8
  • ŁÓDŹ — Natolin 8
  • OLSZTYN — Barczewo, ul. Prosta 9
  • WROCŁAW — ul. Jerzmanowska 10C
  • GORZÓW WLKP. — ul. Zielona 33/34

Check prices and availability: +48 500 409 109

Free quote

Materials for your project