Is a board with a membrane enough? Utherm Sarking LE Plus in practice

At a glance

In a roof with Utherm Sarking LE Plus, visible moisture can arise via more than one path. Run-off of precipitation and airtightness on the room side must be analysed separately. Understanding the function of the layers makes it easier to pinpoint the repair exactly where it is needed. Utherm Sarking LE Plus belongs to the PIR boards for pitched roofs. On both sides it has a multi-layer gas-tight laminate. The terms “polyurethane boards” and “polyurethane foam” are broader than the precise designation of the PIR product. When assessing the performance of the building envelope, it is worth checking the difference between Utherm Sarking LE and the LE Plus variant with an additional membrane. Before assessing the solution, the full name of the Sarking variant must be established before selecting additional membranes.

Two boards with a dark membrane and a lifted corner, illustrating Sarking LE Plus

Sarking LE PIR boards and an additional Plus membrane

It is easy to confuse the functions of the components if one overlooks the fact that the standard LE variant cannot be attributed the factory-made element characteristic of Plus. A correct diagnosis should make it possible to establish the actual extent of the underlay layer even before purchase. During the inspection, compare the variant name and the list of separate materials for laps and terminations with the information on how it is to be installed.

Resistance of the layer above the timber structure

In the UNILIN catalogue, Sarking LE Plus has a lambda of 0.022 W/(m·K). Continuous insulation above the rafters limits the contribution of timber to heat flow through the main insulation layer, but requires genuine continuity over the structure. When interpreting the thermal result, therefore, check the cross-section and the run of the boards, instead of attributing the parameter of the material alone to the entire roof slope.

For a correct interpretation, the rafters and fasteners passing through the Sarking LE Plus layer must be taken into account. A similar notation does not have to mean the same thing, because the above-rafter layer limits the influence of timber but does not eliminate all thermal bridges. Such a distinction makes it possible to separate the benefit of the small thickness from the improvement in the continuity of the entire roof slope. Before drawing a conclusion, ask for the cross-section of the structure together with an assessment of the roof-to-wall junction, so that the figures refer to the actual layer.

Polyurethane insulation made of large profiled boards

The format of Sarking LE Plus is 2400 × 1200 mm, and all four sides have a tongue-and-groove edge. During the inspection, check that adjacent boards are pushed tightly together and that the profile is maintained even on cut pieces. The tongue-and-groove joint makes it easier to align the components, but it does not replace fastening or the sealed laps of the underlay layer.

When planning and assessing the installation, it is worth matching the large Sarking LE Plus boards to the roof valley, eaves and openings. The installation rules must be checked separately, because cutting to size can remove the profile and require a different termination solution. Establishing the cause should allow the layout of components to be planned before the material is brought onto the sloping surface. When assessing the polyurethane insulation, check the position of the factory edges, supports and cut lines in difficult locations before accepting the completed joint.

Membrane laps and terminations at openings

The membrane bonded to Sarking LE Plus reduces the number of separately laid layers, but the path of water must be closed at the details. First inspect its laps at the roof window and at the base of the penetration through the roof slope. Penetrations by fasteners and the junction with the wall require separate inspection: the factory bond between the membrane and the board does not seal these locations.

Before a repair is specified, the direction of water flow and access to the sealing of the Plus membrane must be preserved. It should not be concluded from appearance alone, because the membrane on the full board does not automatically close the perimeter of every opening. The information gathered should allow the factory part to be combined with the details executed on site. Before specifying the repair method, check the course of the laps, the accessories at penetrations and the sequence in which the layers are closed, as well as the history of previous work.

Requirements at the chimney and attic comfort

Fire reaction class E for this PIR variant does not make it non-combustible. At the chimney, the board does not exempt you from maintaining the required distances and safeguards. In the documentation, separate the proximity of the chimney from the summer solar gains of the attic insulated with Sarking LE Plus.

When reading the scope of the declaration, fire protection and summer conditions in the attic must be considered separately. Too far-reaching a conclusion would be unjustified, since reaction class E does not mean non-combustibility, and a low lambda does not guarantee a single temperature in summer. The explanation should make it possible to retain the correct solution at the hot element and to assess the actual heat sources. In case of doubt, the chimney detail and the assumptions regarding windows, shading and air exchange must be checked, instead of settling for a general assurance of quality.

Polyurethane insulation above the rafters: the full scope

In the offer, distinguish Sarking LE from Sarking LE Plus by checking the thickness, coverage area, accessories and protection of the membrane during transport. When assessing an offer or completed works, take into account the change in covering height after adding Sarking LE Plus above the rafters.

Before assessing quality or price, it is worth pricing the fixings, flashings and work at the gutter alongside Sarking LE Plus itself. Without this, the result is difficult to compare, since gaining space inside may involve adapting elements on the outside of the roof. Identifying the scope should make it possible to compare complete renovation scopes with an identical attic function. Base any conclusion about cost or quality on data covering the layer balance and the list of works at the eaves, windows, ridge and penetrations.

A case worth considering

If moisture appears at a window in a roof with Sarking LE Plus, its path must be established. It may concern external water drainage or the flow of humid air from the interior. The presence of the membrane on the board does not determine which mechanism has occurred. The inspection should check both terminations around the frame. Only then can the necessary repair be determined without unjustified replacement of the entire insulation.

7 branches. Materials closer to your project.

Izoprofil.org map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E
  • BŁONIE — ul. Sochaczewska 138A
  • RADOM — ul. Grobickiego 8
  • ŁÓDŹ — Natolin 8
  • OLSZTYN — Barczewo, ul. Prosta 9
  • WROCŁAW — ul. Jerzmanowska 10C
  • GORZÓW WLKP. — ul. Zielona 33/34

Check prices and availability: +48 500 409 109

Free quote

Materials for your project